无码人妻一区二区三区免费看,午夜影视免费,极品妇女扒开粉嫩小泬,国产顶级熟妇高潮xxxxx

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://sdhph.cn

當前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

国产成人亚洲综合网站小说 | 最新亚洲春色av无码专区| 欧美xxxx性bbbbb喷水| 激情内射亚洲一区二区三区爱妻| 国产熟人av一二三区| 欧洲极品无码一区二区三区| 真人做人试看60分钟免费| 久久国产主播福利在线| 国产成人精品人人| 日韩人妻熟女中文字幕a美景之屋| 人妻精品动漫h无码专区| 亚洲午夜精品a片久久www慈禧| 精品国产乱码久久久久久浪潮小说 | 少妇无套内谢久久久久| 亚洲欧美日韩综合俺去了| 无码被窝影院午夜看片爽爽jk| 麻豆一区二区三区蜜桃免费| 日日碰狠狠躁久久躁9| 少妇裸体性生交| 天天做天天爱夜夜爽导航| 亚洲国产精品久久久久婷婷老年 | 亚洲大尺度无码无码专区| 欧美在线三级艳情网站| 国产精品99久久精品爆乳| 日本高清www午色夜在线视频| 秋霞无码久久一区二区| 久久中文字幕人妻熟av女| 伊人久久大香线蕉无码不卡| 99精品一区二区三区无码吞精| 亚洲一区天堂九一| 大桥久未无码吹潮在线观看| 中文字幕乱码免费专区| 看全色黄大色大片免费久久 | 亚洲精品久久久久久动漫| 欧美激情日韩精品久久久| 亚洲欧美第一成人网站7777| 久久不见久久见免费影院| 久久亚洲中文字幕精品一区| 伊人久久精品一区二区三区| 久碰人妻人妻人妻人妻人掠| 久久久久亚洲av无码a片软件|